douglas-floor-restoration_lye-natural-soap_stadtmuseum-freising_dinesen.jpg

Stadtmuseum Freising

After extensive restoration, Stadtmuseum Freising opened in autumn 2007 in this new venue with a new museum concept.

Historical building — Germany

_____

Douglas
Thickness 35 mm. Width 300-400 mm. Length 7 m
Finish Lye and Natural Soap

It is no coincidence that the local history museum Stadtmuseum Freising is situated in the heart of the town of Freising in southern Germany. Since 1890, the museum has preserved and displayed the fascinating and important thousand-year history of Freising. Since 1965, the museum has resided at Marienplatz in a listed building that was previously a school.

douglas-wood-floorboards_lye-natural-soap_stadtmuseum-freising_dinesen.jpg
douglas-floor-restoration_lye-natural-soap_stadtmuseum-freising_bench_dinesen.jpg

In 2007, custom-designed glass display cases were installed as well as a new lighting system. The 300-year-old larch wood floor was restored and supplemented with long, wide Douglas planks from Dinesen. The combination creates a harmonious ambience and provides a discreet background for the comprehensive collection.

douglas-solid-wood-floorboards_lye-natural-soap_stadtmuseum-freising_dinesen.jpg

With the restoration project, the museum has managed to create the perfect setting for presenting the history of the town. Thus, the museum has itself become an important milestone with a venue that is future-proof until the day when the building may enter the history books itself. However, this is not going to happen any time soon, as an additional expansion of the museum has already been planned.

douglas-wooden-floorboards_lye-natural-soap_stadtmuseum-freising_dinesen.jpg
douglas-flooring_lye-natural-soap_stadtmuseum-freising_dinesen.jpg

Tilmeld dig vores nyhedsbrev

Ved tilmelding accepterer du vores persondatapolitik.

Fortæl os om dit projekt

Vedhæft gerne din grundplan eller en skitse, hvis det er muligt.
Samtykke
Nyhedsbrev

Kvalitetssikringsskema

Transportskader
Er der fundet transportskader på plankerne? Hvis ja, beskriv:
Plankebredde - Kontrolmålinger
Træfugt - Kontrolmålinger
Klima - inden montage
Er bygningen lukket og klimaet stabilt?
Ja
Nej
Underkonstruktion
Fugtmåling (underkonstruktion)
Træfugt %
Betonfugt (Max. værdi)
Vedlæg destruktiv målingsrapport udført af 3. part.
Rethed (Målt over 2 m retholt)
Krav: +/-2
Gulvvarme
Ja
Nej
Hvis ja, er systemet trykprøvet?
Ja
Nej
Hvis indstøbt i beton, hvor længe har systemet kørt inden montagen? (Krav: min. 1 md.)
Dato for start
Montage
Montør
Kontrol - 10-brætsmål
Slibning - Er gulvet plant, uden synlige sliberidser set 1,6 m over gulvet?
Ja
Nej
Behandling

Der skal tages, og medsendes, billeder af følgende: Før montage, før overfladebehandlingen samt det færdige resultat. Der skal tages 3 billeder af hvert stadie, samt et billede af huset/bygningen set udefra.

Log in

Opret

Indtast oplysninger herunder for at oprette en bruger

Glemt dit kodeord?

Subheader

Din kurv er tom

Total

GBP 0,00
(inkl. moms)